24-hour TSP Monitoring Results
Station CM_WF1a, The Wah Ming House                            
Start Finish Weather Filter Weight (g) Elapsed Time Reading Sampling Time Flow Rate (m3/min) TSP Conc. Action Level Limit Level Observations / Remarks Sampler Filter
Date Time Date Time   Initial Final Initial Final (hrs) Initial Final Average  (µg/m3)  (µg/m3)  (µg/m3)   ID ID
05-Apr-12 08:00 06-Apr-12 08:00 Sunny 2.7598 2.8409 3613.37 3637.37 24.00 0.8048 0.8048 0.8048 70 185.3 260 Rock bolt  Wah Fu 995
11-Apr-12 08:00 12-Apr-12 08:00 Sunny 2.774 2.8244 3637.39 3661.39 24.00 0.7978 0.7978 0.7978 44 185.3 260 Grouting  Wah Fu 1005
18-Apr-12 08:00 19-Apr-12 08:00 Fine 2.8049 2.8574 3661.39 3685.39 24.00 0.8016 0.8016 0.8016 45 185.3 260 Drilling Wah Fu 1008
23-Apr-12 08:00 24-Apr-12 08:00 Fine 2.7637 2.8108 3685.38 3709.38 24.00 0.7959 0.7959 0.7959 41 185.3 260 Operation of mobile crane and loading Wah Fu 1015
27-Apr-12 08:00 28-Apr-12 08:00 Fine 2.7909 2.8214 3709.38 3733.38 24.00 1.0963 1.0963 1.0963 19 185.3 260 Operation of mobile crane and loading Wah Fu 1022
                        Min. 19          
                        Max. 70          
                      Average 44